by Sacor | Aug 8, 2026 | Uncategorised
Australian mining and processing operations now face the urgent reality of 2026 water recycling targets, where recovering up to 85% of process water is becoming the baseline for operational viability. You likely understand the mounting costs of waste disposal and the...
by Sacor | Aug 7, 2026 | Uncategorised
With the National Environmental Protection Agency (NEPA) now fully operational as of July 2026, the era of legacy tailings management has officially ended for Australian mine sites. Investing in a high-specification mineral concentrate dewatering centrifuge is no...
by Sacor | Aug 6, 2026 | Uncategorised
With Western Australian electricity tariffs increasing by 2.75 per cent as of July 2026, the financial burden of continuous pumping is no longer a manageable overhead. A typical site might move over a billion litres of water annually; however, many operations still...
by Sacor | Aug 5, 2026 | Uncategorised
The assumption that a filter press is the default solution for tailings dewatering is increasingly challenged by the operational realities of modern Australian mineral processing. While achieving high cake dryness remains a priority, the shift towards continuous flow...
by Sacor | Aug 4, 2026 | Uncategorised
With decanter centrifuge systems now capable of recovering up to 85% of process water from tailings, the traditional slurry dam is fast becoming an expensive liability for Australian mine sites. Operators nationwide recognise that rising water procurement costs and...
by Sacor | Aug 3, 2026 | Uncategorised
Increasing the RPM of your separation equipment is often a costly miscalculation that prioritises mechanical speed over actual process efficiency. Many Australian plant managers struggle with high moisture content in cake solids and spiralling energy costs, largely...